In collaboration with Tuolumne Utilities District and California State Water Resources Control Board, Curtis Creek Elementary School now has a more reliable, safer water supply. The project involved the construction of more than a mile-long water pipeline to connect the school with TUD’s public water system and was funded by a grant through the State Water Board.
This summary originated from a story produced by Alex MacLean for The Union Democrat.